Mining

Prepare a concentrator's operation before construction is finished.

In a mining project, operations are prepared while the plant is being built. MagORAI focuses on what each department must have ready, process area by process area, and shows the owner what is missing before the end of the phase.

Process

The process, from mine to shipment

Each stage of the process needs people, procedures, spare parts and systems ready on start-up day.

Mine Crushing Grinding Flotation Thickeningand filtration Concentrateshipment Tailings Tailingsstorage reclaimed water
By area

What must be ready in each area

Examples of what operational readiness resolves before start-up, and how it is tracked in MagORAI.

AreaWhat must be ready to operateHow it is tracked in MagORAI
Crushing and grindingStaffing and shifts, operating and start-up procedures, critical spare parts for crushers and mills, maintenance plans loadedDeliverables by department with owner, status and date, linked to the OR plan milestones
FlotationTrained operators, reagent control, procedures for process deviations, laboratory up and runningActual progress against plan, and alerts when a deliverable puts the milestone at risk
Thickening and filtrationInspection routines, service contracts, stock of filter cloths and spare parts, maintenance system with its equipment hierarchyDeliverable review with the copilot and the version approved by the department
Tailings and waterOperating and monitoring procedures, defined owners, permits and environmental commitments in viewA view of readiness status by area for the committee and the end-of-phase gate review
ShipmentOutbound logistics, contracts, sampling and quality proceduresReadiness report ready to present, without consolidating spreadsheets by hand
By department

The departments that prepare operations

Each one has its deliverables and its copilot. The owner sees the whole picture.

01

Operations

Organization, staffing, procedures and start-up of each area.

02

Maintenance

Plans, equipment hierarchy, critical spare parts and the maintenance system. Once operating, it continues in MagEAM.

03

Supply

Service contracts, initial stock and critical suppliers.

04

People

Recruitment, training and certification of operators and maintenance technicians.

05

Safety and environment

Risks, permits and commitments that must be met at start-up.

06

Technology and systems

Control, management and data systems ready for the start of operations.

FAQ

Questions from mining projects

What people ask us most in mining projects.

When should operational readiness start in a mining project?

At pre-feasibility, starting with the definition of the OR strategy and the functional OR work plan for the next phase of the project. From there, the main activities and a high-level schedule for the project's execution stage are framed, and the resources needed and a detailed scope of what is to be done in the next phase are defined.

Does MagORAI work for an expansion of a plant that is already operating?

Yes. Unlike a greenfield project (built from scratch), where the main challenge is starting up a new facility, a brownfield project works within live environments with established processes, people and assets. MagORAI helps the professionals in charge of operational readiness ensure a smooth and safe transition from construction and integration to ongoing operation, minimizing disruption to current production.