In an energy project, operations are prepared while the facility is being built and tested. MagORAI focuses on what each department must have ready, system by system, and shows the owner what is missing before the end of phase.
Each system needs people, procedures, spare parts and control systems ready on the day the facility goes into service.
Examples of what operational readiness leaves settled before energization, and how it is tracked in MagORAI.
| System | What must be ready to operate | How it is tracked in MagORAI |
|---|---|---|
| Generation and conversion | Staffing and shifts, operating and start-up procedures, critical spares for generation equipment and inverters, maintenance plans loaded | Deliverables by department with owner, status and date, linked to the OR plan milestones |
| Battery storage | Operating and emergency procedures, specific staff training, service contracts with the supplier, monitoring defined | Actual progress against plan and alerts when a deliverable puts the milestone at risk |
| Substation and line | Switching procedures, inspection routines, transformer and protection spares, owners defined | Deliverable review with the copilot and the version approved by the department |
| Control center | Control and data systems tested, communication procedures with the grid operator, shifts covered | A view of readiness status by system for the committee and the end of phase |
| Connection and energization | Connection tests and requirements documented, permits and environmental commitments in view | Readiness report ready to present, without consolidating spreadsheets by hand |
Each one has its deliverables and its copilot. The owner sees the whole.
Organization, shift staffing, operating and switching procedures.
Plans, equipment hierarchy, critical spares and the maintenance system. Once operating, it continues in MagEAM.
Service contracts, initial stock and critical suppliers.
Recruitment, training and certification of electrical operators and maintenance technicians.
Risks, permits and commitments that must be met at start-up.
Control, management and data systems ready for the start of operations.
Readiness is organized by system and by department, whether the facility is new or already operating.
A power plant, a substation or a line starting from scratch: everything that must be ready is planned from the start and tracked through energization.
The existing and the new operation coexist. MagORAI focuses on what must be ready for the new part without mixing it with the ongoing operation.
A battery system brings new equipment, procedures and training. They are prepared as a project of its own, connected to the plant's plan.
What people ask us most in energy projects.
At pre-feasibility, to start with the operating model and the OR strategy. Staffing, training and spare parts are planned from there: they have long lead times, and being late on them is what delays energization.
Yes. Readiness is organized by system and by department, and a substation or a line is prepared with the same logic as a power plant.
What MagORAI leaves ready for operation is picked up by MagEAM, VSC's platform for maintenance work management.
Tell us what stage it is at. We will reply with a proposal to get started.