In oil and gas, operations are prepared while the facility is being built and commissioned, with demanding process safety requirements. MagORAI focuses on what each department must have ready, system by system, and shows the owner what is missing before the end of phase.
From product receipt to pipelines and terminals. Each system needs people, procedures, spare parts and control systems ready on start-up day.
Examples of what operational readiness leaves settled before start-up, and how it is tracked in MagORAI.
| Area | What must be ready to operate | How it is tracked in MagORAI |
|---|---|---|
| Receipt, treatment and separation | Operating and start-up procedures, operating windows, trained operators, critical spares for compressors, pumps and valves | Deliverables by department with owner, status and date, linked to the OR plan milestones |
| Processing | Normal operation and emergency procedures, interlocks verified, maintenance plans loaded | Actual progress against plan and alerts when a deliverable puts the milestone at risk |
| Storage | Transfer and inventory procedures, tank inspections, spill response defined | Deliverable review with the copilot and the version approved by the department |
| Pipelines and terminals | Pipeline operating and integrity procedures, patrol routines, coordination with those who receive or ship | A view of readiness status by area for the committee and the end of phase |
| Control room | Control system tested, communication and emergency procedures, shifts covered | Readiness report ready to present, without consolidating spreadsheets by hand |
Each one has its deliverables and its copilot. The owner sees the whole.
Organization, shift staffing, operating, start-up and emergency procedures.
Plans, equipment hierarchy, critical spares and the maintenance system. Once operating, it continues in MagEAM.
Service contracts, initial stock and critical suppliers.
Recruitment, training and certification of process operators, control room operators and maintenance technicians.
Process safety, emergency response, permits and commitments that must be met at start-up.
Control, management and data systems ready for the start of operations.
Readiness is organized by area and by department, whether the plant is new or already operating.
A facility, pipeline or terminal starting from scratch: everything that must be ready is planned from the start and tracked through start-up.
The existing and the new operation coexist. MagORAI focuses on what must be ready for the new part without mixing it with the ongoing operation.
MagORAI is also used for internal audits at key milestones, such as closing one stage or moving to the next.
What people ask us most in oil and gas facilities.
Yes. Readiness is organized by system and by department, and a pipeline or a terminal is prepared with the same logic as a plant.
As deliverables of the operations and the health, safety and environment departments, with owner, status and date. MagORAI does not replace engineering studies: it tracks that what those studies require is ready before start-up.
What MagORAI leaves ready for operation is picked up by MagEAM, VSC's platform for maintenance work management.
Tell us what stage your project is at. We will reply with a proposal to get started.